Member Login

Login to your account

Username *
Password *
Remember Me


JUser: :_load: Unable to load user with ID: 17160
Friday, 29 March 2013 15:41

Wind Power Battery Facility Opens Featured

Written by
Rate this item
(0 votes)

March 29 -- The Notrees Wind Farm and Battery Facility hosted an open house for its new battery project, which Plant Manager Casey Hayes said opened Dec. 27. Duke Energy, the owner of the wind farm, matched a $22 million grant from the U.S. Department of Energy to built the battery project. >>View Article

Read 1652 times

Leave a comment

Make sure you enter all the required information, indicated by an asterisk (*). HTML code is not allowed.


Prev Next
ACORE logo HORIZ white
The American Council On Renewable Energy

Contact Us

1600 K Street NW Suite 650
Washington, DC 20006
Mail: P.O. Box 33518
Washington, DC 20033