Member Login

Log in

Friday, 28 June 2013 14:11

After much delay, offshore wind power set to sail Featured

Written by 
Rate this item
(0 votes)

June 28 -- It’s been 12 years since the first offshore U.S. wind farm was proposed for the Massachusetts Nantucket Sound, but so far, not a single turbine has been put up. The struggles to get the Cape Wind project built stand in stark contrast to the torrid growth of the U.S.’s onshore wind industry — and the success of offshore wind in Europe. >>View Article

Read 1022 times

Leave a comment

Make sure you enter the (*) required information where indicated. HTML code is not allowed.


Prev Next
ACORE logo HORIZ white
The American Council On Renewable Energy

Contact Us

1600 K Street NW Suite 650
Washington, DC 20006
Mail: P.O. Box 33518
Washington, DC 20033