Member Login

Log in

Thursday, 21 June 2012 09:01

[ACORE Member] SunEdison Completes Texas Solar Plant

Written by 
Rate this item
(0 votes)

June 20 -- US solar company SunEdison, in partnership with utility CPS Energy, has completed a 19.8MW photovoltaic (PV) installation in Texas.  The two arrays that make up the installation are located on land at the Des Rios Water Recycling Center, owned by the San Antonia Water System. >>More

Read 1669 times Last modified on Wednesday, 13 February 2013 17:09

Leave a comment

Make sure you enter the (*) required information where indicated. HTML code is not allowed.


Prev Next
ACORE logo HORIZ white
The American Council On Renewable Energy

Contact Us

1600 K Street NW Suite 650
Washington, DC 20006
Mail: P.O. Box 33518
Washington, DC 20033